VAULT / DevOps & IT / 0726-code-schedule-update-scheduled
Code → Schedule: Update Scheduled
Starts on a schedule, then runs 7 nodes across Code, Emailsend, If, Schedule Trigger, Ssh.
54
Needs hardening
🧩 Nodes (7)
CodeEmailsendIfSchedule TriggerSsh
🔑 Credentials needed
- Smtp
- SshPassword
🛡️ Vault audit — 54/100 · last checked 2026-10-27
- ✗Connections integrity. 1 dangling connection — will not run as shipped.
- ✗Error handling. None. A failing node fails silently or kills the run.
- ✓Hardening patterns. Guards / branching / batching present.
- ✓Trigger configured. Has a start trigger.
This one needs work before production. In its Production Pack version we repair the flagged items, inject error handling and ship a setup doc — the raw file below stays free, exactly as-is.
⬇ Download raw JSON (free)Read the matching hardening guideGet the fixed + documented version in the Ops, Alerts & Support Pack ($29)
More in DevOps & IT
License & provenance. Raw workflow from the MIT-licensed community collection (© Zie619). License: included. Our audit score, fixes and docs are our work — the raw JSON is free forever.