VAULT / Spreadsheets / 0675-limit-code-automation-scheduled
Limit → Code: Automation Scheduled
Starts on a schedule, then runs 14 nodes across Code, Google Sheets, Limit, Removeduplicates, Schedule Trigger.
62
Needs hardening
🧩 Nodes (14)
CodeGoogle SheetsLimitRemoveduplicatesSchedule TriggerSetSortStop and ErrorStrava
🔑 Credentials needed
- GoogleSheets OAuth2 API
🛡️ Vault audit — 62/100 · last checked 2026-10-27
- ✗Connections integrity. 2 dangling connections — will not run as shipped.
- ✓Error handling. Error paths exist (Error Trigger / onError / stop-and-error).
- ✓Hardening patterns. Guards / branching / batching present.
- ✓Trigger configured. Has a start trigger.
This one needs work before production. In its Production Pack version we repair the flagged items, inject error handling and ship a setup doc — the raw file below stays free, exactly as-is.
More in Spreadsheets
License & provenance. Raw workflow from the MIT-licensed community collection (© Zie619). License: included. Our audit score, fixes and docs are our work — the raw JSON is free forever.