VAULT / Spreadsheets / 0402-schedule-filter-update-scheduled

Schedule → Filter: Update Scheduled

Starts on a schedule, then runs 13 nodes across Filter, Gmail, Google Sheets, Merge, Schedule Trigger.

68
Needs hardening

🧩 Nodes (13)

FilterGmailGoogle SheetsMergeSchedule TriggerSetStop and Error

🔑 Credentials needed

  • Gmail OAuth2
  • GoogleSheets OAuth2 API

🛡️ Vault audit — 68/100 · last checked 2026-10-27

  • ✗Connections integrity. 2 dangling connections — will not run as shipped.
  • ✓Error handling. Error paths exist (Error Trigger / onError / stop-and-error).
  • ✓Hardening patterns. Guards / branching / batching present.
  • ✓Trigger configured. Has a start trigger.

This one needs work before production. In its Production Pack version we repair the flagged items, inject error handling and ship a setup doc — the raw file below stays free, exactly as-is.

More in Spreadsheets

License & provenance. Raw workflow from the MIT-licensed community collection (© Zie619). License: included. Our audit score, fixes and docs are our work — the raw JSON is free forever.